Monday, April 23, 2012

more framing April 21st-23rd

Driving Miss Olivia

Bathroom wall now opened to the the shower

Dad's bathroom, with shower opening

view from Redwood Lane

no more ceiling

Grady's closet

upstairs addition


upstairs addition


footer filled up with cement

outside footer filled up with cement

footer filled up with cement

through the dining room, through Dad's closet, into his room

Dad's bathroom


responding to the crowd

looking down Vicksburg

Thursday, April 19, 2012

How many construction workers does it take to install a steel beam?


 

Let's get this steel beam up!

Let's get this steel beam up!

someone dropped their side
steel post and footing



we've got lift off

up and away!


almost there, will it fit?

new doorway beam, post and footing

new doorway beam, post and footing

new post - outside kitchen wall

Can I drive?

removing Grady's wall

removing Grady's wall

Grady getting some fresh air

Grady's not too sure about his new room

Grady on the job

Grady found his calling - fork lift operator



beep beep, Grady coming through

Wednesday, April 18, 2012

More framing

Dad's bedroom and bathroom ceiling

Dad's bedroom and bathroom ceiling

Dad's bedroom and bathroom ceiling

Looking out from the upstairs bathroom, the flooring for Grady's closet. Dad's bathroom below.

Temporary framing - getting ready for the steel tomorrow!!

Dad's bathroom peeking over the fence.

Tuesday, April 17, 2012

The beginning stages of framing

lumber ready ready for the framing

an exterior wall for Dad's room.

an exterior wall for Dad's room.


There's an Olivia in the footing.


There's a Grady in the footing.


Can you see the wall from the frontyard?